Access: Open this function from one of the following locations:
-
Click the
button in the toolbar.
-
Select Tools > PMI > PMI Update from the menu bar.
Update the PMI data. In some cases (especially for symbolic text), the PMI might not be updated.
For example, with your assembly file closed, if you change a part name (say from P2 to P2_A) and then load the assembly file, the part P2_A cannot be found.
In this case, the Reconnect dialog is automatically loaded, enabling you to connect to the P2_A part. However, once the assembly is loaded, the symbolic text may still show P2 and not P2_A. In this case, use PMI Update to update the symbolic text (P2) to reflect the real name of the part (P2_A).
Note: See the PMI and Hole Attributes Preferences for additional update options.
|